Previewing at InfoComm 2026. Launching Fall 2026.

AI agents
built for AV
professionals

Specialist agents transforming AV project inputs into coordinated, build-ready technical outcomes.

AVRIA · Intelligent Project Team
AV Design and Proposals
Henry AV designer 2:32 PM

Boardroom for 24 people. Dual 85" displays, ceiling mics for video conferencing, distributed ceiling audio. Budget around $180k.

Elena bid estimator 2:33 PM

Pulled the spec. Sony FW-85BZ40L on Chief LTM1U tilts, Shure MXA920 ceilings, QSC Q-SYS Core 110f, Crestron UC-CX100-T MTR, NVX-360 AVoIP, Netgear M4250-10G2F+. Within budget. Standards cited on every row.

+22 more items
Elena bid estimator 2:33 PM
AVRIA-PROP-2026-0517
Executive boardroom · ready to send
Download →
Engineering · Equipment Rack Analysis
Rack Load & Thermal Review
You AV designer 10:12 AM

Perform a thermal + power review on the conference room credenza rack before commissioning. Layout attached.

Marriott_Rack_Layout_v3.pdf
12 RU · 8 active devices · credenza-mounted
Uploaded
Henry AV design / engineering 10:13 AM

Continuous 410 W / 1,399 BTU/h. Credenza cooling: 125 CFM through a low-intake / high-exhaust path. UPS: 1.5 kVA for ~10-min graceful-shutdown runtime. Full math and commissioning checks in the report.

Henry AV design / engineering 10:13 AM
Rack_Thermal_Report.pdf
Power · heat · credenza CFM · UPS · commissioning checks
Download →
CAD / Drafting · Document Generation
BoM-to-Drawing Workflow
You AV designer 9:24 AM

Approved BoM came back from the client. Need drawings for the install crew.

AVRIA-BOM-2026-0517.csv
38 line items · Q-SYS / MXNet anchor
Uploaded
Sophia CAD / drafting 9:25 AM

Generated AVSK-01 floor plan, AVSK-02 reflected ceiling plan, AVSK-03 rack elevation, AVSK-04 signal flow. Misc. materials list extracted. Cable pull schedule with 9 runs ready.

Sophia CAD / drafting 9:25 AM
Boardroom_Drawing_Set.zip
4 sketches · misc materials · cable schedule
Download →
Project Control · Deadline Coordination
Kickoff Notes to Action Items
You AV designer 4:08 PM

Internal kickoff just wrapped on the Bates HQ project. Notes attached. Need everyone tracked.

Bates_HQ_Kickoff_Notes.docx
7 pages · 3 stakeholders · 14 action items
Uploaded
Anthony project management 4:09 PM

Drafted 4 calendar holds: site walk Jun 18 9 AM (Mike), Crestron submittal review Jun 24 EOD (Henry), client mockup approval Jul 02 2 PM, conduit pre-pour Jul 09 7 AM (GC). Ready for your approval.

Anthony project management 4:09 PM
Calendar_Reminders.ics
4 events · all owners cc'd
Approve & send →
Procurement · Product Risk Review
BoM Risk Analysis
You AV designer 11:42 AM

Final BoM for the Riverside Court audio refresh. Need a procurement risk read before I send to purchasing.

Riverside_Court_Refresh_BOM.csv
21 line items · Audio + control
Uploaded
Teresa procurement / supply 11:43 AM

3 risks flagged. Shure MXA710: last-buy window closes Aug 2026. Atlas FAP62T: 12-14 week lead time. Crestron DM-MD8X8: superseded, confirm scope before commit.

Teresa procurement / supply 11:43 AM
Riverside_Risk_Memo.pdf
EOL · lead time · supersession
Download →
AV / IT · Network Requirements
Client IT Configuration Review
You AV designer 2:51 PM

Got the IT config template from the client. They want our AV network requirements filled in.

ClientCo_IT_Config_Template.xlsx
6 worksheets · 42 fields
Uploaded
David commissioning / field 2:52 PM

Completed all 42 fields. Dedicated AV VLAN with DSCP priorities 46 / 34 / 26 (audio / video / control). PTPv2 grandmaster on Q-SYS Core. IGMPv3 querier on M4250. Fast-Leave disabled on trunks.

David commissioning / field 2:52 PM
AV_Network_Spec_for_ClientIT.xlsx
DSCP · IGMP · VLAN · PTP
Download →

From project brief
to engineered execution.

Avria reads your project context, reasons over an AV-engineering knowledge graph, and ships citation-checked proposals, calculations, drawings, procurement intelligence, schedules, and AV/IT-ready documentation through a coordinated team of specialized agents.

1 Ask

Describe a room, drop a document, or ask a direct question.

2 Know

An AV-engineering knowledge graph behind every decision.

AVIXA NEC TIA BICSI ADA FAR AES IEEE IETF ASHRAE HDMI Audinate AVRIA Product Catalog AVRIA Engineering Rules AVRIA Design Templates
4 Ship

Engineered output, ready to send.

Engineered BoMs Citation-checked proposals AV construction drawings Statements of work Commissioning checklists Project schedules As-built documentation Procurement orders
PDF DOCX XLSX CSV DWG ICS
Powered by Claude · Anthropic

Built differently,
on purpose.

Minutes, not weeks.

Quote a 24-person boardroom in minutes. The rules engine handles math; you handle judgment.

Standards-cited on every row.

AVIXA · NEC · TIA · ADA. Every line carries the standard reference, so submittals defend themselves.

Engineered,
not guessed.

Capacity checks. Coverage checks. Substitution clauses. AVoIP topology. Sized for the room before it ships.

Request early access.

Avria is coming soon. Join the early-access list to get a personal walkthrough and a direct line to the founder for feedback.

We'll only email you about Avria. No ads, no spam.

Book a demo at InfoComm 2026 · Las Vegas · June 15–19